{"id":152450,"date":"2020-07-10T14:29:19","date_gmt":"2020-07-10T13:29:19","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=change-proposal&#038;p=152450"},"modified":"2021-02-25T09:49:18","modified_gmt":"2021-02-25T09:49:18","slug":"cp1533","status":"publish","type":"change-proposal","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1533\/","title":{"rendered":"CP1533 \u2018Mandatory Sending of D0052 for DCC serviced SVA NHH Metering Systems\u2019"},"content":{"rendered":"","protected":false},"template":"page-templates\/template-global.php","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-152450","change-proposal","type-change-proposal","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":152450,"title":"CP1533 \u2018Mandatory Sending of D0052 for DCC serviced SVA NHH Metering Systems\u2019","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1533\/","categories":[],"tags":[],"content":"\n\t<div class=\"panel-content\">\n\t\t<p>CP1533 intends to update clause 3.2.6.50 in BSCP504 to remove instances of the word &#x201C;new&#x201D; in order to make it clear that D0052s shall be sent in all instances.<\/p>\n\n\t<\/div>\n\n\t<div class=\"panel-section\">\n\t\t<div class=\"accordion\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"implemented\" aria-expanded=\"false\">Implemented<\/h2>\n\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t<p>CP1533 was implemented on 25 February 2021 as part of the February 2021 BSC Release.<\/p>\n\n\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"awaiting-implementation\" aria-expanded=\"false\">Awaiting Implementation<\/h2>\n\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t<p>The CP1533 Assessment Report was presented to the SVG at its meeting on 1 September 2020.&#xA0; The committee unanimously approved the CP.<\/p>\n<h3>Next Steps<\/h3>\n<p>CP1533 will be implemented on 25 February 2021.<\/p>\n\n\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"cpc-consultation\" aria-expanded=\"false\">Change Proposal Consultation<\/h2>\n\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t<h3>Consultation Responses<\/h3>\n<p>Five responses were received from Suppliers and Supplier Agents, all respondents agreed with the CP and implementation date.&#xA0; Two participants identified costs to implement CP1533 and four of the respondents identified they would be impacted.<\/p>\n<h3>Why Change?<\/h3>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/mod-proposal\/p302\/\">P302 &#x2018;Improve the Change of Supplier Meter read and Settlement process for smart Meters&#x2019;<\/a> introduced clause 3.2.6.50 in <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bscps\/bscp504\/\">BSCP504<\/a>, which requires the new Supplier to send a <a href=\"https:\/\/dtc.mrasco.com\/DataFlow.aspx?FlowCounter=0052&amp;FlowVers=1&amp;searchMockFlows=False\">D0052 &#x2018;Affirmation of Metering System Settlement Details&#x2019;<\/a> flow with a &#x201C;new&#x201D; Standard Settlement Configuration (SSC) and &#x201D;new&#x201D; Profile Class (PC) to its new Non Half Hourly Data Collector (NHHDC), following the receipt of the Meter Technical Details (MTDs) from the new Meter Operator Agent (MOA).<\/p>\n<p>The <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/smg-issue\/issue-86\/\">Issue 86 Workgroup<\/a> identified that this process was not being followed by all participants, identifying the wording &#x2018;new&#x2019; implies an optional dataflow, which will only be sent if a Supplier re-configures the smart meter as part of the switch. However, the original intention was the D0052 is required to be sent in all CoS events.&#xA0;<\/p>\n<h3>Next Steps<\/h3>\n<p>CP1533 will be presented to SVG for decision at its meeting on Tuesday 1 September 2020.<\/p>\n\n\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"assessment\" aria-expanded=\"false\">Assessment<\/h2>\n\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t<p>At it&#x2019;s meeting on on 3 March 2020 (<a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/meeting\/svg229\/\">SVG229\/17<\/a>) SVG confirmed they were happy for the CP to go straight to consultation phase and did not ask for any additional questions to be added to the CP Consultation.<\/p>\n\n\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"submission\" aria-expanded=\"false\">Submission<\/h2>\n\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t<p>CP1533 was raised by Elexon on 8 July 2020.&#xA0; The Change Proposal has been raised on the back of <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/smg-issue\/issue-86\/\">Issue 86 &#x2018;Review of processes potentially impacted by Ofgem&#x2019;s Faster Switching Programme&#x2019;<\/a><\/p>\n\n\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/change-proposal\/152450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/change-proposal"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/change-proposal"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/change-proposal\/152450\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=152450"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=152450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}