Issue 93 Workgroup 6
This is the sixth meeting of Issue 93 ‘Review of the BSC metering Codes of Practice’ Workgroup.
- Confirm decision on the proposed BSCP32 process for Aspect 07
- Confirm the next aspect to progress as a Change Proposal
- Update the Issue Group on the timeline for the remaining aspects
|
1. |
Welcome and Meeting objectives |
|
2. |
Updates on Actions |
|
3. |
Proposed BSCP32 process and the CoP threshold table |
|
4. |
Aspect 11 ‘Determining the relevant CoP for embedded circuits’ |
|
5. |
Aspect 04 ‘Calibration checks for Main and Check Meters’ |
|
6. |
Aspect 06 ‘Inconsistent use of ‘MWh vs kWh’ |
|
7. |
AOB Items |
|
8. |
Next steps & Meeting Close |
How to join the meeting
Telephone: +44 20 3855 5884
Conference ID: 793 530 740 #