BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//BSC - ECPv6.16.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:BSC
X-ORIGINAL-URL:https://elexon-beta.elexonhostings.co.uk/bsc
X-WR-CALDESC:Events for BSC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20220327T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20221030T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20230326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20231029T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20240331T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20241027T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20230323T143000
DTEND;TZID=Europe/London:20230323T163000
DTSTAMP:20260611T002825
CREATED:20230313T144148Z
LAST-MODIFIED:20230314T094120Z
UID:195597-1679581800-1679589000@elexon-beta.elexonhostings.co.uk
SUMMARY:Upcoming BSC Change Proposals meeting: March 2023
DESCRIPTION:The following upcoming changes will be presented and discussed:  \n  \nChange Proposals originating from Issue 93 ‘Review of the BSC metering Codes of Practice’:  \n\nClarify the Duplicate communications path requirements in CoPs 1 and 2\n\n(Impact: Suppliers\, Meter Operators\, Data Collectors)\n\n\nMandating Calibration checks for Main and Check Meters\n\n(Impact: Meter Operators\, Technical Assurance Agents\, LDSOs\, Registrants\, Suppliers)\n\n\nClarifying the error limits for Active Energy for sites operating at low power factors\n\n(Impact: CVA Registrants\, Suppliers\, DSOs\, NETSO\, Generators\, and Meter Operator Agents)\n\n\n\nOther Upcoming BSC Change Proposals:  \n\nImproving the use of the D0215 data flow in the relevant Industry processes\n\n(Impact: LDSO\, SVA MOA\, and Suppliers)\n\n\nAllowing HHDCs to undergo protocol approval prior to completing qualification\n\n(Impact: Half Hourly Data Collectors)\n\n\nTo clarify sending of a D0151 is required for all COS NHH loss processes \n\n(Impact: Suppliers\, Data Collectors)\n\n\nEnabling Embedded LDSOs to calculate and submit Site Specific LLFs as required \n\n(Impact: LDSOs)\n\n\n\n  \nAdditionally\, time will be made available if there are any of the Potential BSC changes awaiting initial consideration that you would like to discuss. Please let us know in advance of any of these backlog changes you would like to discuss\, so that we can ensure appropriate resource and time is made available. \n  \n  \n  \n\n\n\n\nAgenda Item \n\n\nLead \n\n\n\n\nWelcome and Meeting Objectives \n\n\nIvar Macsween (Elexon) \n\n\n\n\nUpcoming BSC Change Proposals – CPs originating from Issue 93; \n\nClarify the Duplicate communications path requirements in CoPs 1 and 2\nMandating Calibration checks for Main and Check Meters\nClarifying the error limits for Active Energy for sites operating at low power factors\n\n\n\nChange Analysts (Elexon) \n\n\n\n\nOther Upcoming BSC Change Proposals \n\nImproving the use of the D0215 data flow in the relevant Industry processes\nAllowing HHDCs to undergo protocol approval prior to completing qualification\nTo clarify sending of a D0151 is required for all COS NHH loss processes\nEnabling Embedded LDSOs to calculate and submit Site Specific LLFs as required\n\n\n\nChange Analysts (Elexon) \n\n\n\n\nAOB \n\n\nWorkgroup \n\n\n\n\nMeeting Close \n\n\nIvar Macsween \n\n\n\n\n  \n 
URL:https://elexon-beta.elexonhostings.co.uk/bsc/events-calendar-item/upcoming-bsc-change-proposals-2/
LOCATION:Elexon Ltd\, 4th Floor\, 350 Euston Road\, London\, NW1 3AW\, United Kingdom
CATEGORIES:Change meetings,Meetings
GEO:51.5242552;-0.1421212
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Elexon Ltd 4th Floor 350 Euston Road London NW1 3AW United Kingdom;X-APPLE-RADIUS=500;X-TITLE=4th Floor\, 350 Euston Road:geo:-0.1421212,51.5242552
END:VEVENT
END:VCALENDAR