BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//BSC - ECPv6.16.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:BSC
X-ORIGINAL-URL:https://elexon-beta.elexonhostings.co.uk/bsc
X-WR-CALDESC:Events for BSC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20150329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20151025T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20160327T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20161030T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20170326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20171029T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20160704T100000
DTEND;TZID=Europe/London:20160704T160000
DTSTAMP:20260621T085907
CREATED:20160620T131159Z
LAST-MODIFIED:20191114T124739Z
UID:65961-1467626400-1467648000@elexon-beta.elexonhostings.co.uk
SUMMARY:TERRE Stakeholder Forum
DESCRIPTION:This event is no longer active. However\, you can still get Wider Access and TERRE updates and developments regarding: \n\nRelease details\nthe derogation request\nBrexit\nindustry testing\n\nView the latest Wider Access and TERRE updates. \nTERRE Stakeholder Forum \n​​TERRE (Trans European Replacement Reserves Exchange) Project \nProject TERRE is part of the implementation of the European legal Guideline on Electricity Balancing.   There are eight European Transmission System Operators (TSOs) currently participating in Project TERRE\, including National Grid\, and those from France\, Spain\, Portugal\, Switzerland\, Italy as full members and from Ireland and Greece as observers.      TERRE will be a system by which these TSOs can do joint balancing of generation and demand using a common set of bids and offers. As the introduction of TERRE is likely to have significant consequential impacts on the BSC and Grid Code\, National Grid has recently raised BSC Modification P344 to define and approve the BSC impacts. \nElexon\, on behalf of the TERRE TSOs\, is pleased to be hosting the next TERRE Stakeholder Forum. This event aims to address the key topics raised during Project TERRE’s public consultation process\, giving participants the opportunity to hear about how Stakeholders’ comments have been taken into account and to learn further details about positions on the project’s design. The forum\, designed as a Q&A session\, will contribute to guarantee the best level of understanding of Project TERRE amongst its stakeholders. \nAgenda \n\nWelcome and introduction\nPresentation of project status\nPresentation of stakeholder responses and TERRE TSO answers to this feedback\nStakeholders’ presentations\nQ&A session\nTERRE project next steps\n\nRegistration \nThis Forum is open to industry members across Europe. If you are interested in attending\, please register on ENTSO-e’s website before 23 June 2016.
URL:https://elexon-beta.elexonhostings.co.uk/bsc/events-calendar-item/terre-stakeholder-forum/
LOCATION:Elexon Ltd\, 4th Floor\, 350 Euston Road\, London\, NW1 3AW\, United Kingdom
CATEGORIES:Industry Meetings
GEO:51.5242552;-0.1421212
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Elexon Ltd 4th Floor 350 Euston Road London NW1 3AW United Kingdom;X-APPLE-RADIUS=500;X-TITLE=4th Floor\, 350 Euston Road:geo:-0.1421212,51.5242552
END:VEVENT
END:VCALENDAR