List of all BSC Change Proposals
CP1594 Creating an Approval Process for New and Legacy Communication Types
Older metering communication types are quickly becoming redundant and are being replaced by newer communication types. Elexon are proposing to create an approvals process to allow for the managed end dating of older technologies, such as Public Switched Telephone Network (PSTN), Circuit Switched Data (CSD) and subsequently 2G.
CP1593 New Interconnector Fuel Type Category: Greenlink
Changes are needed to the Insights Solution to ensure data relating to the new Greenlink Interconnector is provided to market participants alongside existing data relating to Settlement arrangements in the Great Britain (GB) electricity market.
CP1592 Upgrade of NHHDA and EAC/AA systems from Oracle 12c to version 19.21
Upgrade NHHDA and EAC/AA systems to the latest available version of Oracle 19.21.
CP1591 New Site Visit Check Code Valid Set value
The implementation of Distribution Connection and Use of System Agreement (DCUSA) Modification DCP411 ‘Charging De-energised sites’ involves updating the J0024 data set by adding a new Enumeration Value.
CP1590 Enabling use of DTN agent appointments process for P434
Enabling suppliers who may be considering the use of DTN derived Dataflows to meet the requirements to migrate their Unmetered Supply (UMS) portfolios over the 12 months up to the UMS mandate go live date.
CP1589 Create Additional Market Participant Role Codes
Market Participant Role Code’ is a single character alphanumeric value which is used as a unique identifier for certain Market Roles. There are 36 possible Role Codes to be allocated to different Market Participant Roles, which are defined in the Market Domain Data (MDD). In order for new Market Roles to be created in the future, a change to the format of the ‘Market Participant Role Code’ Data Item is required to increase the number of available Role Codes. Moving to a two-character alphanumeric value would provide hundreds of new potential Market Participant Role Codes.
CP1588 Mandating Calibration Checks for Main and Check Meters
This CP proposes to provide an assurance process to confirm whether a Meter Type is still operating within the allowed accuracy limits or is drifting towards, or beyond, the extreme end of the limits. It will also define the steps to be taken where an issue is identified mitigating the risk to Settlement. CP1588 originates from Issue 93 ‘Review of the BSC Metering Codes of Practice’.
CP1587 Obsolete Metering Equipment
Providing a process and transition period to remove unsupported assets and mitigate the risk to Settlement.
CP1586 Defining the requirements for Minimum Burden and CT ratios
In some cases, the Current Transformer (CT) ratios for the maximum current of the circuit is not appropriately selected, even though these ratios are vital for accurate energy settlement as they ensure safe and precise current conversion, maintain metering equipment within its optimal operating range, and uphold regulatory compliance standards. CP1586 originates from Issue 93 ‘Review of the BSC Metering Codes of Practice’.
CP1585 Submission of Half Hourly data for Embedded LDSO sites to Host LDSO
This CP proposes that the Half Hourly Data Collector send Half Hourly data for Embedded LDSO connected sites to the Host LDSO via D0275 and/or D0036 to improve the quality of forecasting and reduce manual effort.